UG Laboratory List | |||
Sr. No. | Name of Lab. | Sr. No. | Name of Lab. |
1 | Basic Electrical lab |
6 |
Power Electronics & Drives lab |
2 | Electrical Machines lab |
7 |
Control System lab |
3 | Electrical Measurement & Instrumentation lab |
8 |
Switchgear & Protection lab |
4 | Computer Lab |
9 |
Automation and Control Lab |
5 | Microprocessor & Microcontroller lab |
10 |
Renewable Energy Lab |
PG laboratory List | |||
11 | Advanced Power system Lab |
12 |
Project Lab |
Total | 12 |
Laboratory Name- Basic Electrical Laboratory | Laboratory Resources- 1 Phase Auto. Transformer 270V/6A, D.C. Power Supply 0-30 V 5A, 3 Phase Full Wave Rectifier 60A,CRO,R-L-C Trainer kit,Synchro-Trans-Receiver Error Detector,Wooden model of Electrical machine,Different types of starters with Three Phase Induction Motor,D.C. Shunt Generator- Induction Motor Set,D.C. Shunt Motor-DC Compound Genset,Alternator – DC Compound Motor Set,Dimmer stat1 Phase- 6 No.3 Phase-01 No,Motor Generator Set with control panel,D.C. Position Control,Microprocessor based Stepper Motor control,D.C. Motor speed control system Brake load Test on D.C. Motor,Universal Motor Load test kit 1 HP |
Area of Laboratory- 66 sqm | |
Total Investment- 7,91,098 /- Rupees |
|
Utilization of Laboratory- S.Y. T.Y. Final year B.Tech. |
Laboratory Name- Electrical Machines Laboratory |
Laboratory Resources- DC compound motor- 3 Phase Alternator Set, DC compound motor- DC compound Genset, Synchronous motor- DC shunt Generator Set, DC series Generator- 3 Phase Induction motor,Capacitor start- capacitor run induction motor,Single Phase universal AC/ DC motor, AC Integrated machine, Pole Changing motor, 3 Phase transformer bank Synchronous induction motor,DC power supply 50A,Induction generator DC shunt motor Electrical Machines Trainer kit |
Area of Laboratory-66sqm | |
Total Investment-6,73,949/- Rupees | |
Utilization of Laboratory- S.Y. & T.Y. B.Tech. |
Laboratory Name- Electrical Measurement and instrumentation Laboratory | Laboratory Resources- D.S.O. 2 Channel, 60MHz ,IGS/s, Kelvin Double Bridge Maxwell Bridge, Schering Bridge, Strain Gauge with Instrumentation Amplifier, Wheat Stone Bridge, D. C. Potentiometer, A.C. Potentiometer, Anderson Bridge, Wien’s Bridge, PLC Trainer Kit, Transmission Line Trainer Kit, 20 MHz, 4 trace 2 channel oscilloscope,DC 0-12v power supply, DC 0-30v power supply,Digital multimeter Study of Thermister characteristics Trainer kit ,Study of Piezoelectric transducer, Study of Hall effect transducer Trainer kit : speed measurement unit,Study of Amplitude modulation transmitter kit,Study of pressure measurement module,Study of Inductive pick-up Trainer kit,Study of Capacitive pick-up Trainer kit |
Area of Laboratory- 66Sq.mm | |
Total Investment- 4,70,827/- Rupees |
|
Utilization of Laboratory- S.Y. & T.Y. B.Tech. |
Laboratory Name- Computer Laboratory |
Laboratory Resources- 1. Dell Make Computer core to Due |
Area of Laboratory- 66Sq.mm. | |
Total Investment- 2283312/- Rupees | |
Utilization of Laboratory- S.Y. T.Y. Final year B.Tech. |
Laboratory Name- Microprocessor and Microcontroller Laboratory |
Laboratory Resources- 1. 8085 CPU mp Trainer Kit |
Area of Laboratory- 66 sqm | |
Total Investment-133862/- Rupees | |
Utilization of Laboratory- S.Y. T.Y. Final year B.Tech.
|
Laboratory Name- Power Electronics & Drives | Laboratory Resources- 1. Speed control of 3ph Induction motor by 3ph Cycloconvetor 2. Speed control of DC Motor 3. Tektronix Make DSO 4. Speed control of AC motor by inverter ckt kit 5. Speed control of 3ph. Induction Motor 6. 3phase Half wave converter kit 7. 3phase full wave converter kit 8. 3phase Induction motor speed controller by slip recovery scheme 9. Chopper Motor controller PE-7 kit with 10. DC motor DC Drive trainer kit using dual converter kit |
Area of Laboratory-83 Sq.mm | |
Total Investment-9,45,711/- Rupees | |
Utilization of Laboratory- S.Y. & T.Y. B.Tech. |
Laboratory Name- Control System Laboratory |
Laboratory Resources- 1. D.C. Position control kit |
Area of Laboratory-66 Sqm | |
Total Investment-375313.22/- Rupees | |
Utilization of Laboratory- T.Y. B.Tech |
Laboratory Name- Switchgear & Protection Laboratory | Laboratory Resources- Solid state static universal relay including overcurrent relays (Instantaneous, Definite time, IDMT, Very inverse), overvoltage & Under voltage relays, %Impedance relays; Microprocessor based o/c relay, Transformer protection demo panel, Alternator protection demo panel, MCB, ELCB, ,MCCB, GODO switch, MCB+ELCB, Induction disc relay, Connecting probes, DC power supply |
Area of Laboratory-66 Sqm | |
Total Investment-7,08,445/- Rupees | |
Utilization of Laboratory- T.Y. B.Tech |
Laboratory Name- High Voltage Engineering Laboratory |
Laboratory Resources- 1. 0-60Kv oil test kit |
Area of Laboratory- 66Sq.mm. |
|
Total Investment- 5,31223/- Rupees |
|
Utilization of Laboratory- B.Tech & M.Tech student. |
Laboratory Name- Advanced power system Laboratory |
Laboratory Resources- 1. Dell Make Computer core to Due |
Area of Laboratory- 66Sq.mm. | |
Total Investment- 2283312/- Rupees | |
Utilization of Laboratory- M.Tech. |
Laboratory Name- Project Laboratory |
Laboratory Resources- 1. Power Analyzer |
Area of Laboratory- 66Sq.mm. | |
Total Investment- 6,31223/- Rupees | |
Utilization of Laboratory- B.Tech & M.Tech student. |
Software | ||||||
Sr. No. | Description | Make | Deadstock No | Date of purchases | Qty | Amount |
1 | Orcad Pspice 01) Orcad capture 02)Orcad Pspice A/D 03) Orcad Layout plus |
India soft | RIT/ELE/D-11/01/01/1 | 30/03/2006 | 10 User | 571515/- |
2 | Power tool for windows (DAPER+CAPTOR+Unbalanced three phase/single phase studies +TMS) 20BUS & 75 components | Trident techlab | RIT/ELE/D-11/01/02/1 | 12/02/2007 | 5 User | 237120/- |
3 | Mipower software version 6 | Power Reserch Development | RIT/ELE/D-11/01/03/1 | 23/03/2009 | 10User | 489923/- |
4 | ETAP 7.5.1 50 Bus 5 user LAN Educational [BM,LF,SC,STAR,MA,TS,HA | ETAP Automation | RIT/ELE/D-11/01/04/1 | 18/03/2012 | 5 User | 222457/- |
5 | Institutional Package Espoir Smart Interview simulator | Espoir Technology | RIT/ELE/D-11/02/05/1 | 01 | 8925/- | |
6 | Institutional Package Espoir knowledge base English communication Program | Espoir Technology | RIT/ELE/D-11/02/06/1 | 01 | 5250/- | |
7 | Institutional Package Espoir knowledge base English communication Program through Management Idea | Espoir Technology | RIT/ELE/D-11/02/07/1 | 01 | 5250/- | |
8 | Microsoft Paper License Academic win 8(UPGL) | Microsoft | RIT/ELE/D-11/02/05/1to 10 | 07/09/2013 | 10 | 33000/- |
9 | MATLAB-14 | ADCC Infocad Pvt.Ltd Nagpur | RIT/ELE/D-11/03/09 | 20/06/2014 | 25 | 1926897/- |
10 | Turnitin2 Anti Plagiarism | Igrouo infotech | 201/08/2014 | 5,88,988/- | ||
Total | 40,89,325/- |
Sr. No. | Facility | Methodology | Deliverables | Benefits of study |
01 | Automatic programmable ringing bell system :- An automatic programmable ringing bell developed by our R & D center is available for sale. | It develops Programmable output. | Work as per Time-table (No delay, late operation or malfunctioning). Day wise Programmable System. No need to operate manually 32 Times User Programmable Voltage level - 150 Volts to 300 Volts, AC | School, Colleges and Educational Institute , Coaching Classes Industries/office |
02 | Automatic water level controller : An automatic water level controller is developed by our R & D center is available for sale. | It controls the motor pumping system. | Automatic water level controller controls the pumping system for overflow of over head water tanks. | Residential (Apartments) Commercial (Hospitals, Institutes etc.) and Industries. |
03 | Third party inspection : Department can provide third party inspection of new and old electrical installations. | Study of layout Data collection using meters Data analysis Suggestions. | Inspection report and testing reports of different installations and systems. | Residential (Apartments) Commercial (Hospitals, Institutes etc.) and Industries. Public services.(municipality) |
04 | Power factor analysis: Individual energy billing includes charges towards unit consumed, maximum demand and power factor. The utility company has penalty structure based on measured power factor during billing cycle. | Study of layout Data collection using meters Data analysis Suggestions. | Power quality audit report directed towards measurement of power factor and recommendations for power factor improvement | Residential (Apartments) Commercial (Hospitals, Institutes etc.) and Industries. Public services.(municipality) |
05 | Lighting System: Electrical department team will perform the lighting audit in your organization to examine your energy consumption and quality of light | Accurate analysis of existing lighting system. Evaluation of ratio of lumens per unit power means luminous efficacy of lighting system. Suggestions. | The information collected during lighting audit includes the measurement of lumens, recommendation of energy efficient lighting system and lighting controls. | Residential (Apartments) Commercial (Hospitals, Institutes etc.) and Industries. Public services.(municipality) |
06 | Load profile Analysis: Electrical department team is able to perform the load profile study in your organization to examine your energy consumption and demand in period of second to second and store data for solutions. | Study of layout Data collection using meters Data analysis Suggestions. | Record of load factor and provides easy to read reports on load characteristics and give recommendations on load reduction activity | Residential (Apartments) Commercial (Hospitals, Institutes etc.) and Industries. |